St. Mark CES- renovation- itโ€™s closing time

We have arrived to end of our demolition ( interior) Our thoughts turn towards putting the building back together. We would like to discuss, at length , at Tues site meeting

Library (above ceiling)
Sprinkler mains have been placed. Our steel and welding should be complete by Monday. Steve (sheet metal) said he would concentrate running of duct. Soon, we can frame T-bar ceiling resulting in the placement of lights. Bruce (Canaan Drywall) look forward to seeing on Tues( bring the coffee)

Hallway beside Library can be easily prepared to receive T-bar ceiling๐Ÿ‘! We are all learning!

Both girls and boys change room ceilings are in need of a drywall. Sprinkler mains have been run and Steve said his metal duct would be a priority. Again, Bruce we need your thoughts on Tuesday.

Food Nutrition room- we need piping / floor ASAP

Footings are near completion. Again, we need in ground plumbing beneath the slab placed ASAP. We are ready for our masonry contractor.

โ€œThere is always an endโ€

https://larryarbuckle.com

St. Mark CES- renovation update

We need contractor to form footings NOW. We have just pumped out water and rain is forecast for Friday! also note: pls have hollow metal frames (doors) onsite prior to coming above ground.๐Ÿข๐Ÿข๐Ÿข๐Ÿข๐Ÿข๐Ÿข๐Ÿข๐Ÿข

Mechanical contractor: pls provide undergrounds (addition) ASAP

Mech curbs are now placed on the roof! George ( GRRC) pls connect with Scot ( our super) as we would like curbs to be watertight first of next week. RTUโ€™s arrive July 30th

Contractor cutting floor in the food nutrition room

We are now starting to hang metal duct ๐Ÿ‘

https://larryarbuckle.com

St. Mark CES- we are turning the corner!

2 cannibals are eating a clown
One cannibal turns to the other cannibal and says
โ€œDoes this taste funny to youโ€

Steel has arrived ( Mirage) re- roof top units๐Ÿ‘๐Ÿ‘๐Ÿ‘

Steel is being placed( RTU) erector is placing steel

Mechanical Room- demolition near completion

Electrical distribution panels are onsite.

We still need gas meter removed to allow sprinkler and water pipe to enter building.๐Ÿข๐Ÿข

Footings re- additions are now ready for forming. I am told contractor will be onsite tomorrow.

Curbs are being built and then placed. By end of week ready to roof (watertight) curbs. Roof Top Units arrive July 30th. ๐Ÿ‘€