St. Mark CES – Windows Are Being Installed

Windows are being installed: Waiting For

  • installation plywood parapet wall needed
  • curbs [RTU] to be placed and openings cut
  • roof drains to be connected
  • locker base and concrete pads entrance – to be poured
  • once windows installed – AVB to be applied followed by brick veneer
  • installation of retaining wall

 

DCIM/103MEDIA/DJI_0422.JPG

Roofing contractor needed soon

Painters on deck – interior heat required

Ceramic tile hallways starts hmmm! in 2 weeks.

DCIM/103MEDIA/DJI_0421.JPG

Elevator lift / stage. Base being formed.