St. Mark CES – Preparing the Roof

Contractor is on roof applying blue skin followed with plywood: GRRC [our roofing contractor] is on deck. Where are our curbs [RTU]????????

Note:  This elevation is the  new entrance to our addition. All earthworks must be complete prior to occupancy allowing students and teachers access.

 

DCIM/103MEDIA/DJI_0424.JPG

Contractor is pouring concrete for our entrance slabs and locker base. We need retaining wall built ASAP.

 

DCIM/103MEDIA/DJI_0425.JPG

 

Contractor planning their next move!

DCIM/103MEDIA/DJI_0423.JPG

 

I am told Metal Duct contractor starts Monday.

 

 

Concrete has been placed: Lift

St. Mark CES – Windows Are Being Installed

Windows are being installed: Waiting For

  • installation plywood parapet wall needed
  • curbs [RTU] to be placed and openings cut
  • roof drains to be connected
  • locker base and concrete pads entrance – to be poured
  • once windows installed – AVB to be applied followed by brick veneer
  • installation of retaining wall

 

DCIM/103MEDIA/DJI_0422.JPG

Roofing contractor needed soon

Painters on deck – interior heat required

Ceramic tile hallways starts hmmm! in 2 weeks.

DCIM/103MEDIA/DJI_0421.JPG

Elevator lift / stage. Base being formed.

St. Mark CES – plenty of rain today

Rain most of the day:

Going Foward: Metal Deck [roof] is now in place. Waiting for plywood [ parapet] – curbs [RTU] to be set in place. GRRC [roofing] needed soon

Windows scheduled for Monday [ installation] – followed by spray [AVB] then installation of brick veneer. Painters are on deck.

DCIM/103MEDIA/DJI_0419.JPG

Note: we need to start thinking  about heat, in the building, as finishing trades will be arriving soon. Our next milestone is T-bar ceiling – the week of Dec 10th- all above work to be in place.

 

DCIM/103MEDIA/DJI_0420.JPG

Opening for lift [stage area] ongoing


video below / interior