St. Mark CES – Preparing the Roof

0 Comments

Contractor is on roof applying blue skin followed with plywood: GRRC [our roofing contractor] is on deck. Where are our curbs [RTU]???????? Note:  This elevation is the  new entrance to our addition. All earthworks must be complete prior to occupancy allowing students and teachers access.   Contractor is pouring concrete for our entrance slabs and […]

St. Mark CES – Windows Are Being Installed

0 Comments

Windows are being installed: Waiting For installation plywood parapet wall needed curbs [RTU] to be placed and openings cut roof drains to be connected locker base and concrete pads entrance – to be poured once windows installed – AVB to be applied followed by brick veneer installation of retaining wall   Roofing contractor needed soon […]

St. Mark CES – plenty of rain today

0 Comments

Rain most of the day: Going Foward: Metal Deck [roof] is now in place. Waiting for plywood [ parapet] – curbs [RTU] to be set in place. GRRC [roofing] needed soon Windows scheduled for Monday [ installation] – followed by spray [AVB] then installation of brick veneer. Painters are on deck. Note: we need to […]