Nelson HS – June 4, 2020 construction update

Dropped by the site today / lots happening. Parking area is being prepared for asphalt. Manufacturing Room is being prepped for slab on grade [SOG]. Steel has arrived cafeteria/ library. CPP rm: hanging duct and electricians are fishing wire.