Nelson HS- Aug 27/20- update

Sod being placed outside of CPP rm
glass needed classroom doors CPP
CPP rm / I am told all exterior doors and frames arrive this afternoon / installed tomorrow
The guys are still working on pipe leading to Cosmetology
Brick veneer has started / cosmetology
A look / from the inside / of our new cafeteria and library