Nelson HS- April 22/21- Const update

Work on bridge is ongoing. Siding is being applied.

New Cafeteria- flooring contractor installing ceramic tile.

Library- contractor now installing overhead lights.

Contractor repairing terrazzo floor.

Auto-Body Shop- Overhead doors are being installed.