Nelson HS- May 20/21- update

Dave / Aerloc – please contact our super [Ray] – helps us out and install glass in the areas above. As per the cafeteria entrance we would like to remove the temporary wall allowing everyone to see in. The wall makes us look like a construction site. Also, We need glass installed in the windows [bridge] making us watertight. Hope you can help us out buddy!???😎😎😎

New carpet – Library

Entrance to Library. Floor needs to be tapered joining existing to new.

The guys are working on installing posts re- parking area lighting.

We getting close as we push to wrap up prior to June 15th. The main slugging is over as we concentrate finishing up the β€œpretty” tasks. The end is near!πŸ™πŸ½πŸ™πŸ½πŸ‘€