Upper Left April 12th – Upper Right April 18/22














classrooms / T-bar is now being installed ceilings. I am told contractor re- lateral clips arrive Thursday. Note! Lateral Clips are being installed above T-bar. Care must be taken not to damage ceiling frame. Once lateral clips installed allows the arrival of floor contractor.