Milton 10 CES – construction progress- completion is near!!!
Exterior- work continuesForming concrete sidewalks – pouring Monday.Gym floor- contractor installing vinyl base.Handrails now onsite / installation started/ stairwellsCeramic tile starting / front washroom walls.Front Foyer / starting placement of floor tile.Childcare / East elevation / sidewalks needed.Childcare- handicap push pads to be made operable.Childcare- dishwasher is being installed.Childcare- janitor sink to be connected.Childcare- electrical contractor installing smoke detectors.Childcare- wooden benches to be installed.Childcare- electrical panel / classroom to be made operable.Childcare- placement of ceiling tile needed.