New Cafeteria- Placement of floor tile 50% complete.
Cafeteria- Drywall contractor building bulk-head & framing ceiling above doors.

New Elevator- footing has been poured.


Terrazzo floor now repaired / hallway👍

Entrance to Library.

New Library- waiting re- flooring.