
Work on bridge is ongoing. Siding is being applied.
New Cafeteria- Lighting is now powered on👍👍👍👍

New Cafeteria- flooring contractor installing ceramic tile.

Library- contractor now installing overhead lights.

Contractor repairing terrazzo floor.

Auto-Body Shop- Overhead doors are being installed.
You must log in to post a comment.