St. Kateri Tekakwitha CHS – construction progress – Sept 21/23

Blog Summary: (AI Summaries by Summarizes)
  • The placement of the precast 4th floor east is nearing completion.
  • The progress made by the masonry contractor on the west side will pave the way for the steel contractor to begin erecting the steel.
  • Once the steel is in place, the roofing contractor can proceed.