  • Skilled workers are currently installing a metal decking roof on the west side of the building, providing a sturdy foundation for the construction process.
  • Parapet walls will be installed soon to add an extra layer of protection and visual appeal to the building's exterior.
  • In-floor heating systems are being installed in the cafeteria to ensure a cozy and comfortable space.