St. Kateri Tekakwitha – Waiting For Steel – April 25 2023

We are now waiting for steel- East

Preparing SOG East well underway – pouring soon

French Basin

West- elec underground ongoing.

This is where the rubber meets the road– As per critical path steel is next followed with precast. Stay Tuned!