Milton 11 CES – construction progress – Sept 29

Blog Summary: (AI Summaries by Summarizes)

Project Update: Underground Piping and Upcoming Steps

We are nearing completion of our underground piping installation. Before we can pour the slab on grade, it is crucial to have the following in place:

  1. Vapour Barrier: This will help prevent moisture from seeping into our foundation.
  2. 2″ Styrofoam: Essential for insulation and temperature control.
  3. Metal Mesh: To reinforce the slab and ensure durability.

This is a significant undertaking, and we will need additional manpower to get it done efficiently.

In addition, we are anticipating the arrival of steel lintels, windows, and hollow metal door frames onsite shortly.

October is projected to be an extremely busy month for us as we aim to achieve weather-tight conditions before the snow arrives. Let’s keep the momentum going!

Piping Installation
Project Site


https://youtu.be/zPSaTl9KHgA?si=yDuSn96uZ67c832b

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Scroll Up

Discover more from L A Drone

Subscribe now to keep reading and get access to the full archive.

Continue reading