St. Kateri Tekakwitha CHS – construction progress – sk8ter Boy

Blog Summary: (AI Summaries by Summarizes)
  • Steel lintels for the 4th floor east are still awaited, which may cause concern for the masonry contractor.
  • Pouring of the topping for the 2nd floor west is scheduled for tomorrow, indicating progress.
  • The goal of being watertight by Christmas is still on track.