Galvanized exterior lintels are required for the 2nd floor east. Load bearing walls have already been built, and once window lintels are in place, we can proceed with the placement of precast for the 3rd floor. Our goal is to have everything ready for precast by June 19th. Our team is currently working well together, and we are hopeful that we will be able to start on the 3rd floor soon.

However, we seem to be falling behind on pouring the slab on grade, and this task needs to be addressed as soon as possible. Despite the setback, we are pleased to report that work is still progressing well, and we are optimistic about our timeline.

In need of window lintels 2nd floor east.

Pouring Slab on Grade needed.