St. Kateri Tekakwitha – construction progress Aug 22/23

Blog Summary: (AI Summaries by Summarizes)
  • The masonry contractor is currently working on the load-bearing walls of the 3rd floor east building and aims to finish constructing all the walls on that floor by next Friday.
  • The steel for all areas is expected to arrive this week, which will further advance the construction process.
  • The contractor at the rear of the building is preparing the site for the parking area, enhancing the overall functionality of the project.
default
default
default

Video below 360 drag your mouse or watch wearing goggles / virtual