The maximum span for a concrete bond beam can vary depending on several factors, including the design requirements, loads imposed on the beam, and the specific characteristics of the concrete mix used. However, there are some general guidelines that can be followed.

Bond beams are horizontal structural elements typically used in masonry construction to provide horizontal reinforcement and connect masonry walls or columns. They are usually designed to resist tension and shear forces.

In general, the maximum span for a concrete bond beam should not exceed 3 times the height of the masonry wall or column being supported. This guideline helps ensure that the bond beam can adequately distribute the loads and provide sufficient support to the masonry above.

For example, if you have a masonry wall that is 10 feet (3 meters) high, the maximum span for the concrete bond beam supporting it would be approximately 30 feet (9 meters).

However, it’s important to note that these are general guidelines, and the design of bond beams should always be carried out by a qualified structural engineer or designer who can consider the specific requirements and conditions of the project. They will take into account factors such as the specific loads, masonry type, concrete strength, reinforcement details, and other considerations to determine the appropriate span for the bond beam.