N E Oakville HS – Rooftop Units Installed: Construction Project Update


The construction project has reached significant milestones, as all rooftop units are now installed, achieving a 100% watertight status. The gym floor is equipped with acoustic flooring, anticipating the upcoming topping pour. This week marks the commencement of the flooring contractor’s work, alongside plans to expedite the millworker and smart board installation. The masonry contractor is nearing completion, paving the way for asphalt, sidewalk, and curb installation. The landscape contractor’s arrival is also imminent. As the project approaches its final stages, all trades are encouraged to maintain momentum on the road to success. The team is enthusiastic about the progress and collaborative efforts needed to complete the project effectively.